1
/
of
6
Dsers
PVC Long Lead
PVC Long Lead
Regular price
$34.99 USD
Regular price
$0.00 USD
Sale price
$34.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
SPECIFICATIONS
Color: Green, Blue, Pink
Dog Leash Type: Long Lead
High-concerned chemical: None
Length: 19ft/39ft
Lifestage: All stages
Material: PVC
Premium PVC Material for Maximum Durability & Convenience
Our long dog training leash is crafted with high-quality, heavy-duty PVC-coated rope, designed to withstand the toughest outdoor use. The 8mm thick round core is reinforced for exceptional tensile strength, making it ideal for medium to large dogs that love to pull or explore.
The smooth PVC coating provides all-around protection: it is 100% waterproof, dirt-resistant, and odor-proof. Unlike traditional nylon ropes, this leash repels mud, rain, and stains, and can be easily wiped clean with a damp cloth—no soaking or scrubbing required. The non-porous surface prevents bacteria buildup, keeping the leash hygienic even after trips to the beach, lake, or muddy trails.
Built to resist tangling, fraying, and stretching, this leash maintains its shape and strength over time. Note: This leash comes without a handle for flexible use—you can hold it directly or add your own custom grip.





SIZE

Share
